Buat Bungkus Hantar
This blog discusses issues that arise in the field of logistics.
Muhammad Aslam B Saedan
Mohamad Nabil B Zainol
Amy Zahdrifah Bt Abd Mutalib
Farah Nabilah Bt Abd Manaf
Guestbook
1. bbhlogistics.blogspot.com
2. logtransportation.blogspot.com
3. havoclogistics.blogspot.com
4. intergratedlogisticsandmanagement2014.
blogspot.com
5. kpmlogistics.blogspot.com
Credits
Layout by
Rin
with the background from
Dollicrave
. Icons from
moonstonedaydreams
.
All Right Reserved.
Mateial Requirement Planning (MRP)
Tuesday, April 8, 2014
3:00 PM
0 Comment(s)
Material requirements planning (MRP) is a production planning and
inventory
control system used to
manage
manufacturing processes. Most MRP systems are software-based, while it is possible to conduct MRP by hand as well.
An MRP system is intended to simultaneously meet three objectives:
Ensure materials are available for production and products are available for delivery to customers.
Maintain the lowest possible material and product levels in store
Plan manufacturing activities, delivery schedules and purchasing activities.
The basic functions of an MRP system include: inventory control,
bill of material
processing, and elementary scheduling. MRP helps organizations to maintain low inventory levels. It is used to plan manufacturing, purchasing and delivering activities.
"Manufacturing organizations, whatever their products, face the same daily practical problem - that customers want products to be available in a shorter time than it takes to make them. This means that some level of planning is required."
Companies need to control the types and quantities of materials they purchase, plan which products are to be produced and in what quantities and ensure that they are able to meet current and future customer demand, all at the lowest possible cost. Making a bad decision in any of these areas will make the company lose money. A few examples are given below:
If a company purchases insufficient quantities of an item used in manufacturing (or the wrong item) it may be unable to meet contract obligations to supply products on time.
If a company purchases excessive quantities of an item, money is wasted - the excess quantity ties up cash while it remains as stock and may never even be used at all.
Beginning production of an order at the wrong time can cause customer deadlines to be missed.
MRP is a tool to deal with these problems. It provides answers for several questions:
What
items are required?
How many
are required?
When
are they required?
MRP can be applied both to items that are purchased from outside suppliers and to sub-assemblies, produced internally, that are components of more complex items.
The data that must be considered include:
The
end item
(or items) being created. This is sometimes called Independent Demand, or Level "0" on BOM (Bill of materials).
How much is required at a time.
When the quantities are required to meet demand.
Shelf life of stored materials.
Inventory status records. Records of
net
materials
available
for use already in stock (on hand) and materials on order from suppliers.
Bills of materials. Details of the materials, components and sub-assemblies required to make each product.
Planning Data. This includes all the restraints and directions to produce the end items. This includes such items as: Routing, Labor and Machine Standards, Quality and Testing Standards, Pull/Work Cell and Push commands, Lot sizing techniques (i.e. Fixed Lot Size, Lot-For-Lot, Economic Order Quantity), Scrap Percentages, and other inputs.